Tripod Torch of Phase 13A in South Pars Installed

Mr. Payam Motamed said the operation for installing the structure as the last tripod torch of Phase 13 platforms as well as its related deck was carried out in 10 days by sea pad and it ended on Friday. IRAN NEWS ECONOMIC DESK He went on to say that the tripod torch was manufactured at Iran Marine Industrial Company’s (SADRA) in Bushehr, adding that the tripod torch was manufactured in 405 tons weight with 65 meters height.